It rains hard in Thailand. Here is where every drop goes — no pumps needed:
Rain falls on the yard.
The pad is crowned — each half sheds across the asphalt to its nearest perimeter channel (see the small arrows).
Caught by the grated U-channels (blue): north + south boundaries + the N–S connector just west of the entrance forecourt.
All channels gravity-fall west→east — the site drops 1.57 m that way (survey).
Buried crossings feed TWO square UNDERGROUND WATER BOXES (junction + silt trap + flap) sitting on the city drain line — box #1 north, box #2 south (red markers).
Engineer's scheme (13 Jul 2026) — the working plan; pending invert survey + sizing calc. Cyan = existing city drainage.
Ground tint: blue = low, red = high.
⚡ How the site is powered
PEA 3φ 400/230 V service on the entrance road → meter + MDB 160 A at the office (~70 kVA max demand).
DB-CUBES-E: Double Safe + MegaCube (mid-east) · 50 A.
DB-CUBES-SE: MegaCube + MediCube “MC11” + Mini Safe · 50 A.
12 × M1cc dehumidifier circuits (420 W each) off DB-CUBES-E via pod-roof conduit — the climate block sits right beside it.
Lighting: 19 luminaires at the engineer's EE.01 positions (11 Jul 2026) — interior ones are masts bolted to the pods with the head over the aisle (nothing in the roadway); boundary ones are freestanding poles. Plus the office soffit ring.
Budget design intent — final sizing & stamp by the licensed EE (กว.). Amber dots = power flow.
PRESENTATION▾
Viewpoint
Time of day
dawnmiddaynight
Quality
Auto-detected for this device.
Scene
Fades the satellite into haze beyond the site and plants the road verge. The parcel, frontage and motorway stay fully legible.
Investor view
Golden hour · softened context · verge planting · corner hero framing. Then Export 2× or 4×.
Access
Gates slide open on their own track. Key G.
Office
Lifts the roof off and shows the Rev.1 layout. Key R.
Export still
Hides the interface, renders at full resolution and downloads a PNG for brochures.