Regulatory DD — Zoning, Setbacks, Parking

Safebox Pattaya · Parcel 12.943903, 100.908612 · Tambon Nong Prue, Bang Lamung, Chonburi · M7 frontage · ~5 rai

✅ The short version

We are in the RED zone (พ.2 — Commercial). Self-storage is an allowed commercial use. Zoning is not a blocker.

Confirmed 2026-07-04 by our Pattaya architect (Chathathai): city officials say the land is now zoned red commercial under the new Bang Lamung plan, "with documents." One thing still to collect: the official announcement number + a copy of the map sheet as written proof.

Your numbers at a glance

RED พ.2
Zoning — commercial, storage OK
0.5 m
Side / rear setback (solid unit walls)
3 m
Setback from the front road
~5 / 8
Parking spaces required / we have

Setbacks — how far buildings sit from each edge

EdgeSetbackNotes
Sides & rear
(neighbour boundaries)
0.5 m Our unit walls are solid (doors face the inside aisle, no windows on the boundary) → the 0.5 m "blank wall" rule applies. Can drop to 0 m with the neighbour's written consent, or on the Phase-2 land we own.
Any wall that has a door or window facing a boundary 2 m Only applies if a unit is turned so an opening faces out. Current layout avoids this.
Front public road
(our access road)
3 m from the property line Rule is 3 m from your line, or 6 m from the road centreline — whichever is greater. On our road width, 3 m from the line governs.
Motorway 7 (M7) frontage ~6 m (commercial) — confirm This is the only setback still to be nailed down. Highway Dept. sets it in a letter for our exact parcel; budget ~6 m for commercial use. No direct driveway onto M7 — access is via the service/frontage road only.
Fence up to 3 m tall Solid or see-through both fine. Where two public roads meet at a corner, clip the corner with a 4 m splay.

The one real unknown is the M7 highway setback — everything else is standard building-code and settled. Get the Highway Dept. letter (below) and the layout is locked.

Parking — how many spaces we must provide

Rule: storage/warehouse use = 1 parking space per ~120 m² of building floor area.

Our site: ~96 PODs × ~6 m² = ~580 m² of floor area → ~5 spaces required.

We have 8 spaces in the current plan → comfortably covered. Confirm the exact rate with Building Control when we file (self-storage is very low-traffic, so this is not a risk).

What's still to collect (in writing)

#FromWhatTimeline
1 Our architect / Pattaya City Planning
062-365-8456 Mr. Kritsadasit
Red-zone proof: the new Bang Lamung plan's announcement number + a copy of the map sheet, plus a one-line zoning use certificate (หนังสือรับรองการใช้ประโยชน์ที่ดิน) confirming self-storage is allowed. 2–6 wks
2 Chonburi Highway District
แขวงทางหลวงชลบุรี
M7 setback letter: exact setback from our parcel edge + where we can put the entrance off the service road. 45–90 days
3 Pattaya Building Control
(same office as Planning)
Pre-application memo: container/module permit type, fire spacing, exact parking rate, storm-water basin size. 2–4 wks

Do this first

Ask the architect for the red-zone announcement number + map copy. That single document turns "officials say it's red" into proof we can hand a bank or partner — and it closes out the last zoning question for good.

▸ How we got here — the brown-vs-red history (for the record)

Earlier versions of this page went back and forth because Pattaya has more than one map for the same land. Short story:

A separate "Zone 5" map that once caused confusion is just the city's inspector districts — it tells us who to call (Mr. Kritsadasit, 062-365-8456), not what we can build.

Bang Lamung plan — parcel in red commercial
Governing: Bang Lamung plan — parcel = RED พ.2 commercial. Map PDF
EEC land-use plan 2562
EEC overlay (2562) — red/orange boundary at the HSR station; large buildings OK within 2 km. Gazette PDF

Zoning position confirmed 2026-07-04 via Pattaya architect Chathathai (officials confirm red commercial, new Bang Lamung plan). Setback/parking figures from Building Control Act B.E. 2522 (Ministerial Regulation No. 55) and Highway Act B.E. 2535. This is a planning summary, not a legal opinion — confirm the red-zone announcement number and M7 setback letter before the LOI.