Rinse-and-repeat plan · 40 m × 130 m parcel · 96 PODs + 8 cubes + office · ~352 rentable units · target ~฿1.32M/mo at 85% stabilized · pilot at Pattaya 5-rai
Standard Site — Plan View · 40 m × 130 m · scale 1 m = 8 px
↑ NORTH (rear) · ENTRY at SOUTH ↓
Scale 1 m ≈ 8 px · Conceptual layout · final CAD pass needed for turning radius, setback compliance, signage zone · M1/M1cc doors on 2.44 m short end facing drive lanes · M4/M6 doors on 5.90 m long side, paired back-to-back with 2.4 m access aisle between pairs
★ Template totals
Modules built
104
Rentable units
~352
Shipping containers (PODs)
8 × 12 = 96
Site footprint (incl. circulation)
~5,200 m² (≈ 3.3 rai)
Revenue @ 100%
฿1.56M / mo
Year-1 @ 70%
฿1.09M / mo
Year-2 stabilized @ 85%
฿1.32M / mo
Verified dimensions
PODs: 2.44 × 5.90 m container (14.4 m²)
M1 = whole, door on 2.44 m short end
M4 = container ÷ 2, doors on 5.90 m long side
M6 = container ÷ 4, doors on 5.90 m long side
SafeCube / MediumCube: 3 × 6 m = 18 m²
MegaCube: 6 × 6 m = 36 m²
Service lane:7 m wide
M4/M6 pair access aisle: 2.4 m
Office building: 12 × 7 m = 84 m²
Legend — hover modules
M1 std × 20
M1cc × 12
M4 × 40 (80 units)
M6 × 24 (96 units)
SafeCube × 4
MediumCube × 2
MegaCube × 2
Office (12×7m)
Demo POD
7m service lane
Unit mix & revenue
M1 std (20 × ฿9,500)
฿190,000
M1cc (12 × ฿12,000)
฿144,000
M4 (80 × ฿6,500)
฿520,000
M6 (96 × ฿3,400)
฿326,400
SafeCubes (96 lockers)
฿176,000
MediumCubes (32 lockers)
฿86,400
MegaCubes (16 lockers)
฿113,600
Total @ 100%
฿1.56M / mo
Locked (rinse & repeat)
96 PODs / 8 shipping containers
20 M1 + 12 M1cc + 40 M4 + 24 M6
4 SafeCube + 2 MediumCube + 2 MegaCube
84 m² office building
2 demo PODs (1 M1 + 1 hybrid M4/M6)
7 m service lanes
Bang Tao parity pricing at launch
Layout reflects the rinse-and-repeat template at correct dimensions: 7 m service lanes, 2.44 × 5.90 m PODs, 3 × 6 m / 6 × 6 m cubes, 12 × 7 m office. M1 PODs oriented so the 2.44 m door end faces the lane (drive-up); each POD takes 2.44 m of lane length. M4/M6 paired back-to-back along the 5.90 m long side, doors facing outward on both long sides. CAD pass required for turning circles, signage placement, code-compliant setbacks, and final south-zone circulation.